MES, Scheduling & Shop-Floor Data

Custom Software for Manufacturers

Manufacturing Execution Systems, production scheduling, BOM and routing management, shop-floor data collection, and quality control — built for discrete and process manufacturers.

Custom Software for Manufacturers

Industry Reality

The Gap Between ERP and the Shop Floor

Your ERP tracks orders and dollars. Your shop floor tracks parts and minutes. Custom MES bridges the two — and ends the Monday morning "what actually happened last week?" meeting.

Real-Time Shop-Floor Data

Station tablets, barcode scanners, PLC integration (Modbus, OPC-UA). Live production counts, scrap rates, downtime reasons — not Monday's spreadsheet.

OEE & KPI Dashboards

Availability × Performance × Quality by machine, shift, product. Big-screen plant dashboards your line leads actually look at.

Dynamic Production Scheduling

Finite-capacity scheduling with setup matrices, operator skills, and material availability. Reschedule in minutes when a rush order hits.

BOM & Routing Engine

Multi-level BOMs, engineering change orders, phantom assemblies, backflushing. Sync to QuickBooks, Sage, or legacy ERP.

Quality & Inspection

Inline inspection prompts, SPC charts, non-conformance workflows, CAPA tracking, certificates of compliance auto-generated.

Traceability

Full lot and serial traceability — raw material through finished goods to customer shipment. Essential for food, pharma, aerospace.

How We Deliver

Our Process for Manufacturing Projects

1 — On-Site Discovery

We visit your ops — plant, yard, warehouse, clinic — and watch the actual workflow. Written spec within 10 business days.

2 — Fixed-Scope Proposal

Modular scope, fixed price per module, written timeline. You pick the phase order based on what hurts most today.

3 — Prototype in 2 Weeks

Clickable prototype of the three highest-value screens before any backend code. You see the UX before we build the engine.

4 — Sprint Build

Two-week sprints, Friday demos. Industry-specific integrations (Procore, Yardi, OSCAR, etc.) built in parallel.

5 — Pilot & UAT

Pilot team on one site/location/clinic for 2–4 weeks. Real-world data, real-world edge cases. Fix before scaling.

6 — Rollout & Retainer

Phased rollout site-by-site. Retainer covers support, security patches, and a sprint budget for new features.

Most manufacturing clients see first production module live inside 14 weeks.

Free On-Site Discovery

Build software that fits your manufacturing operation

Tell us about your current systems and the one bottleneck that keeps leadership up at night. A senior engineer replies within one business day to book a discovery call.